Bitcoin mining hosting in Kazakhstan
Kazakhstan combines low power prices with a cold climate, and Bull Miners hosts there from $0.0082/kWh at 1 available site. Mining is licensed: operators pay a 2 KZT/kWh mining fee and must use licensed pools. The grid is coal-heavy and ageing, so miners are curtailed first during winter and summer deficits.
Country data checked 2 November 2026 · live rates updated hourly
Our Kazakhstan sites (live)
| Site | Power rate | Monitored uptime | Status |
|---|---|---|---|
| Kazakhstan | $0.0082/kWh | 98.60% | Available |
Power is billed on actual kWh and deducted from your miner's earnings; net earnings are credited to your balance daily. See hosting terms.
Kazakhstan mining at a glance
Public data, checked 2 November 2026. Sources linked.
| Factor | Kazakhstan |
|---|---|
| Power source | Mostly coal (e.g. Ekibastuz GRES-1); ~76% of thermal plants over 50 years old · source |
| Mining electricity fee | 2 KZT/kWh grid (≈ $0.0045), 1 KZT/kWh renewable/own · source |
| Licensing | Mandatory; 76 licensed miners, licensed pools only · source |
| Strategic programme (2026) | 300 MW, 10-year contracts; 10% of net output to the national reserve · source |
| Hashrate rank | #11, −32% YoY, Q4 2026 · source |
| Climate | Ekibastuz Jan mean −14.7 °C, annual 4.1 °C |
Who Kazakhstan suits
Good for cost-focused customers who want a cold-climate site and can tolerate seasonal curtailment.
Cooling
Free-air cooling most of the year; winter is easy on machines but hardest on the grid.
Key risks
- Policy churn: fee levels, asset-sale rules and the '70/30' capacity rule have changed or been reported inconsistently.
- Grid deficits on an ageing coal fleet mean miners are curtailed first.
- Coal-based power is a drawback for ESG-sensitive owners.
Machines we recommend for Kazakhstan
| Model | Hashrate | Power | Price | Why |
|---|---|---|---|---|
| Bitmain Antminer S21 XP (270Th) | 270Th/s | 3,645 W | $2,907.00 | Air-cooled efficiency for a cold site |
| Bitmain Antminer S23 (318Th) | 318Th/s | 3,498 W | $4,799.00 | 11 J/TH air-cooled — lowest power per TH |
| Bitdeer SealMiner A3 Pro Air (290Th) | 290Th/s | 3,625 W | $3,816.00 | 12.5 J/TH air-cooled option |
Estimate profit at Kazakhstan rates with the mining calculator or compare all models on profitability.
Mining hosting in Kazakhstan — questions
Is Bitcoin mining legal in Kazakhstan?
Yes, under licence. Miners must hold a licence, buy power through the state system, use accredited pools and pay a mining electricity fee of 2 KZT/kWh on grid power.
How much does mining power cost in Kazakhstan?
There is no single published mining tariff — power is allocated through a state platform and priced per contract — plus the 2 KZT/kWh mining fee. Our live hosting rate for Kazakhstan is shown in the table on this page.
Why are miners curtailed in Kazakhstan?
The coal-heavy grid ran short in summer 2026 and is stretched in winter. Miners have the lowest priority, so they are cut first when supply is tight.
What is Kazakhstan's strategic mining programme?
Announced in mid-2026: 300 MW from Ekibastuz GRES-1 on 10-year direct contracts at capped tariffs for large (150 MW+) operators, in return for 10% of net mining output going to a national crypto reserve.

